MISSISSIPPI RIVER                                                                     16-Jan-2025
                                                                          45'/50' DEEP DRAFT CROSSINGS
                                                                        (Raw Water Depths at the time of survey)

  CROSSING NAME         MILEAGE      LWRP     DATE 2025        250 LDB         125 LDB CENTERLINE                  125 RDB    250 RDB    SHAPE       PROJECT DEPTH         DREDGE
 Upper Baton Rouge        232.5       2.6        14-Jan        62.0            59.0            57.0                56.0       57.5        XXXX                61.0             --
 Baton Rouge              231.0       2.6        14-Jan        64.0 H I        66.0 I J        66.5 C D            66.5 B C   63.5 D      XXXX                66.0             --
 Red Eye                  224.0       2.4        14-Jan        62.5 G          66.5 G H        68.0 D              68.0 H I   67.0 N       72.0               65.5             --
 Sardine Point            219.3       2.3        13-Jan        63.0            65.0            64.5                65.5       64.5         68.0               64.8             --
 Medora                   212.0       2.1        13-Jan        63.0 C          62.5 C D        63.5 C D            64.0 C     62.5 C       67.0               63.9             --
 Granada                  204.3       1.9        13-Jan        61.0 A B        63.5 F G        63.5 F G            63.5 F     61.5 F G     67.5               62.9             --
 Bayou Goula              197.8       1.8         7-Jan        61.0 G H        63.0 G H        61.5 D              63.0 B C   57.0 F       63.0               60.2             --
 Alhambra                 190.5       1.7         7-Jan        58.5 C          61.5 E F        60.5 E              62.0 B C   57.5 G       65.0               59.2             --
 Philadelphia             183.0        1.5        7-Jan        58.5 G H        61.5 F G        60.0 F G            61.0 H I   61.0 H       61.0               58.2             --
 Smoke Bend               174.2       1.4         7-Jan        62.5            64.0            64.0                64.0       63.0        XXXX                61.9             --
 Rich Bend                158.5       1.2         6-Jan        63.0            64.0            65.5                66.0       66.0        XXXX                60.4             --
 Belmont                  154.0       1.2        6-Jan         60.0            62.0            61.0                61.0       61.0        XXXX                59.9             --
 Fairview                 115.7       0.7        15-Jan        66.0            64.5            63.0                61.5       58.0        XXXX                57.1             --
An asterisk (*) indicates survey data was incomplete or off-line due to dredging operations. Shallower depths may exist in areas not adequately surveyed.
See plotted survey on our "Mississippi River Crossings - Full and Profiles Only" webpage for more detailed depth information.
                                                                                                                      DATE
    NAVD GAUGE          MILEAGE      LWRP        6-Jan          7-Jan          13-Jan          14-Jan          15-Jan
 Baton Rouge              228.4       2.5         21.6           21.7           23.5             23.6               23.3
 Donaldsonville           173.6        1.4        13.2           13.3           15.0             15.1               14.8
 Reserve                  138.7       1.0          9.4           9.5            10.9             10.9               10.6
 New Orleans              102.8       0.6          5.4           5.5            6.6               6.6               6.3
"LDB" and "RDB" = left and right descending banks, respectively.
For additional survey data, visit our Navigation Condition Survey website at          http://www.mvn.usace.army.mil/Missions/Navigation/ChannelSurveys.aspx

DISCLAIMER:
Hydrographic survey data is subject to change rapidly due to several factors including but not limited to dredging activity and natural shoaling and scouring processes.
The U. S. Army Corps of Engineers accepts no responsibility for changes in the hydrographical conditions which develop after the date of publication.
NOTICE:
This data is intended for U. S. Army Corps of Engineers' internal use. This agency accepts no responsibility for errors or omissions contained in this data.
The accuracy of this data is, therefore, not guaranteed. Prudent mariners should not rely solely upon it.